Building Rights in Israel: Percentages, Floors and Farmland
Updated November 29, 2026 · 7 min read
On this page
Short answer. Building rights are the areas and limits that approved plans allow on a lot: square meters or percentages, with limits on coverage, floors, height and setbacks. Older plans split area into main and service space, and newer rules move toward one total. Agricultural land carries no automatic right to a home: a house generally needs an approved plan that provides for it, or a special approval.
A percentage sounds exact, but it means little without the lot, the plan and its footnotes. In a Dunam & Co. plot file, the building rights line records what the plans allow today. Your lawyer and an architect confirm it.
Rights come from plans
Section numbers, periods and rates reflect the law in November 2026.
As a rule, a permit may be granted only for work or use that conforms to the plans (section 145(b) of the Planning and Building Law, 5725-1965, חוק התכנון והבניה, chok ha-tichnun veha-bniya). Under a plan deposited after 1 January 1996, it generally also requires an approved plan setting land designations, division into lots or parcels, building lines, floors or height, and permitted building areas (section 145(g)). In standard-format local plans, the figures sit in the building rights table (טבלת זכויות והוראות בניה, tavlat zchuyot ve-hora’ot bniya), section 5. See how to read a plan.
Percentages and square meters
Building rights (זכויות בנייה, zchuyot bniya) may be stated in square meters or in percentages (אחוזי בנייה, achuzei bniya). The area calculation regulations of 1992 define the total building percentage as the ratio of the total permitted building area to the lot area. The total is the sum of covered areas on all floors, above and below ground, subject to detailed rules (regulations 1 and 4).
Lot area here excludes the part a plan designates for public purposes, unless it stays within the lot and the public gets only a registered easement (regulation 3). So a percentage can apply to less land than the registered parcel.
One example is the state’s preferred housing plan תמ“ל (tamal) 1121 for southern Sderot, approved in 2024. Area cell 1020, a 400 square meter single-home lot, gets 250 square meters of main area above the entrance level, 200 of service area below it, one dwelling unit, and two floors above and one below. That is 62.5 and 50 percent of the lot, 112.5 percent together, since the total counts floors above and below ground. Notes under the table treat the plan’s rights as main and service area together, and let the planning body move area from above the entrance level to below it, total unchanged. The plan also allows such a lot a very small second unit, without extra area.
Main, service and total area
Main area (שטח עיקרי, shetach ikari) serves the building’s main purposes, such as housing, commerce, industry, farming needs, offices or public buildings. Service area (שטח שירות, shetach sherut) supports them: safety and shelter, technical systems, storage, parking, shared lobbies and stairs, open column floors and public passages (regulation 9).
The split is changing:
- A December 2023 amendment lets a plan set total area (שטח כולל, shetach kolel) without the split, and requires separate figures above and below the entrance level.
- An amendment published on 30 September 2025, in force a month later, makes permits under many split plans approved by 3 December 2023 total area permits, for applications filed from then on. Exceptions include a lot with an existing building that will not be demolished and rebuilt, and certain plans that set service area with no limit.
- The Planning Administration’s guideline, updated July 2026, makes total area its policy for new plans, with exceptions such as additions to existing buildings or a reasoned planning need.
Coverage, floors and setbacks
- Coverage (תכסית, tachsit) appears in many rights tables as a percentage of the plan’s numbered area. It limits the ground that building may occupy. A Yoav area plan for moshav farms caps it at 60 percent on each farm’s parcel A (חלקה א’, chelka alef).
- A floor (קומה, koma), in the 1992 regulations, is a space between its floor and the ceiling above, including space below ground or on a roof. Check how your plan counts basements and roof rooms.
- Building lines (קו בניין, kav binyan) set distances from lot edges. Height is limited in meters.
Area allowed by a percentage still has to fit the coverage, building lines and height.
Why farmland carries no automatic right to a home
An agricultural designation (קרקע חקלאית, karka chakla’it) allows what the plan lists for it.
The law adds a second lock for land declared agricultural in the official gazette. It may be used only as the law’s First Schedule allows (section 156(a)). A planning body may permit non-agricultural building or use (not directly needed for farm production, cultivation or raising animals) only under a plan meeting the Schedule’s conditions, or with consent from the committee for protecting agricultural land and open spaces (הוועדה לשמירה על קרקע חקלאית ושטחים פתוחים, ha-va’ada li-shmira al karka chakla’it u-shtachim ptuchim) (Schedule, sections 1, 5 and 7). A local or detailed plan there, where a district plan marks the land for farming or open space, generally needs that committee’s approval or another listed route (section 6).
In the Sderot plan, cells designated open farmland (חקלאי פתוח, chakla’i patuach) allow only a road for farm vehicles and landscaping, and the rights table gives them no building area. The Yoav plan defines a moshav family farm (נחלה, nachala) as land used for housing only within parcel A, and for farm buildings, cultivation and livestock.
Work without a required permit, or against its terms, is an offense, as is use without one or against a plan. The maximum is two years in prison or a fine (doubled on declared agricultural land), further fines can follow, and the landowner can be charged (section 243).
Common questions
Does a high percentage mean I can build a large house?
Not by itself. An architect checks net lot area, coverage, floors, building lines, units, conditions and footnotes together.
Can farmland get building rights later?
As a rule, only through a new approved plan, and a plan can be rejected (sections 85 and 108). Judge the plot on today’s rights, and check plans in progress.
Where do I get the rights in writing?
The local committee must give anyone with an interest in the land planning information within 30 days of a request (section 119a). Permit information also states permitted areas for a requested use (Licensing Regulations, regulation 20).
Can added rights cost money?
They can. The betterment levy (היטל השבחה, hetel hashbacha) is generally half the rise in value caused by an approved local or detailed plan, a relief or a non-conforming use, with exceptions. The owner or long-term lessee must pay by the time the right is realized: a permit that depended on the change, the start of the new use, or a sale or most other transfers (Third Schedule, sections 1, 2, 3 and 7). Agree in the contract who pays.
What to ask
- What are the parcel’s designation, plan numbers and rights table line, after footnotes?
- Which part is set aside for public use, and what lot area is left?
- Will a permit use main and service areas or total area?
- Is the parcel declared agricultural land, and does a district plan mark it for farming or open space?
- Is any existing building permitted, and for what use?
- Has a betterment levy arisen, and who pays it?
Sources
- Planning and Building Law, 5725-1965 (Hebrew, Wikisource copy): sections 63, 85, 108, 119a, 145, 156 and 243, and the First and Third Schedules.
- Area calculation regulations, 5752-1992 (Hebrew, Wikisource copy): definitions and regulations 2A, 3, 4, 8A and 9.
- Amendment to the area regulations, 30 September 2025 (Hebrew, gazette copy on gov.il): total area permits and exceptions.
- Planning Administration guideline 2025/1 on total area, updated July 2026 (Hebrew, gov.il): the 2023 change and current policy.
- Southern Sderot plan תמ“ל 1121, provisions (Hebrew, Israel Land Authority copy): single-home rules, table 5 and open farmland.
- Yoav area plan 632-0232447, provisions (Hebrew, Israel Land Authority copy): coverage cap and family farm definition.
- XPLAN map service, status of both example plans (Hebrew data): approval status and gazette dates.
- Planning and Building (Licensing) Regulations (Hebrew, Wikisource copy): regulation 20.
General information, not legal advice. Laws, procedures and official websites change. Confirm what applies to your parcel with your own Israeli lawyer. These notes do not cover land in Judea and Samaria (the West Bank) or East Jerusalem, where other rules and questions apply.